Hastings Pier Visitor Centre


The Stirling Prize for 2017 was awarded to dRMM for the restoration of the grade II listed pier which was severely damaged by arson in 2010. The 280m long pier was repaired and new deck laid. A new visitors centre was constructed using our Cross Laminated Timber, clad in the limited timber decking that survived the fire. The new visitors centre is 100% KLH UK CLT structure with a warm exposed CLT timber interior. The centre includes a community space and educational centre, along with a rooftop viewing terrace and café.

Hastings Pier Visitor Centre

Carbon Calculation

Total stored/sequestered carbon in the KLH panels for Hastings Pier is 43.02 tonnes


Project Details

Project Value:  £240,000

Project Date: 2014

Services:  Supply and Erect

Timber Volume: 136 m3

Build Period:   6 weeks

Hastings Pier Visitor Centre

Design Team

Structural Engineer: Ramboll

Architect:  dRMM


Stirling Prize 2017 Finalist