Kingsdale School

The Music & Sports Buildings complete the extensive masterplan for the redevelopment of Kingsdale School.

The challenge for the Sports Hall was to transform a generic low-budget box into daylit and expressive architecture. A large simple interior volume offers maximum flexibility for different user-groups. For acoustic reverberation, the Music School has angular form, with special windows for soundproofing qualities. At the same time the building exterior creates a sympathetic addition to the streetscape.

Kingsdale School

Carbon Calculation

  • KLH cross-laminated timber for the Kingsdale School is 847.6m3
  • KLH panels removed approximately 678.1 tonnes of CO2 from the atmosphere
  • 37.9 tonnes of emitted CO2 from transporting the KLH panels from Austria to London
  • Offsetting the CO2 emissions from the transport therefore shows a 'nett gain' of 640.2 tonnes (CO2 removed from the atmosphere)

 

Ultimately, the timber superstructure for Kingsdale School contains approximately 203.4 tonnes of sequestered/stored carbon.

Kingsdale School

Project Details

Project Value:  £4,800,000

Project Dates:  2006

Services:  Supply and Erect

Timber Volume:  847.6m3

Build Period:  9 weeks

Kingsdale School

Design Team

Architect:  dRMM

Structural Engineer:  Michael Hadi Associates

Timber Engineer: Techniker

Contractor:  Galliford Try

Kingsdale School

Awards

2009

Highly commended in the BCSE Industry Awards 'Inspiring Design'

2008

Highly commended in WAF Awards 'Learning' category

Finalist in Building Magazine Awards, Project of the Year category