Ely Boathouse

Learn more

a new home
for the CUBC

The brief was to create a new iconic home for Cambridge University rowing on the banks of the Great Ouse outside Ely, which was to be designed to last at least a hundred years.

Project Info

The dry boathouse, which is the first phase of the overall project, is a composite in-situ concrete and reinforced loadbearing brickwork construction on piled foundations, with the zinc clad folded plate roof formed from prefabricated CLT panels which are left exposed on the underside to form the dramatic ceiling of the first floor spaces.

Download data sheet

Our 
services.

Learn more

More References

References &
Inspirations

 

Hotels

Houten Hotel Almere

Addition to an existing restaurant with over 172 hotel rooms on four floors.

Refurbishment & Extensions

Timber Lofts

A new four-story building and the renovation and reuse of an existing five-story industrial building

Hotels

Hotel Green Solution House 2.0

A prototype for sustainable construction

Hotels

The Ritz-Carlton

Luxury in an exceptional resort

Single Family Houses

Haus S.

Hotels

Kulturhof Stanggass

Refurbishment & Extensions

The new house

Update for a 1980s house

Single Family Houses

Seehaus W.

   

Multi-storey Residential Buildings

Le Haut-Bois

The two structures, a 9- and a 6-storey building, are connected by the unique staircase that is both open on one side and glazed on the…

Single Family Houses

Haus HWG

KLH designer –
Without
registration,
anytime,
anywhere

KLH DESIGNER

ARCHITECTURAL | STRUCTURAL | ECO

Learn more

We are there for you.

+44 (0) 20 3031 8070
General Business: office@klhuk.com
Project Enquiries: enquiry@klhuk.com

KLH UK Limited
23 Jacob Street
London SE1 2BG

We are there
for you.