All Informations about 
Building Physics

Learn more

Thermal &
acoustics.

The efficiency of building components is based on the material-specific characteristics of building products which provide comfort in rooms and resistance against environmental influences.

Wood has natural advantages. For instance, through its low λ value and its ability to adjust to the diffusion processes CLT has the ability to regulate room humidity and climate. Thanks to its cross-laminated structure, KLH® CLT panels – depending on their build up – differ in their values from those specified by the standards for solid timber.

''When it comes to building physics, the characteristics of cross-laminated timber (CLT) are recognised ins both the general underlying documents and subject-specific building physics software.

We offer technical support in the fields of thermal insulation and acoustic performance, moisture and air tightness control as well as other material-specific parameters.

TO THE ARCHITECTURAL DESIGNER

Downloads

Technical Approvals, Certificates and Eco-labels

Our 
services.

Learn more

References

Projects from different
categories and countries

Modular construction

Flexible living units

Modular solutions offer flexibility

Office Buildings

Fifty West

Pioneering architecture in Central Florida

Single Family Houses

House with forest views

New construction of an old farmhouse

Educational Buildings

Glenn Doman School

The symbiosis of sustainable architecture and progressive pedagogy

Hotels

Hótel Jökulsárlón

A hotel near the majestic Vatnajökull glacier

Healthcare Buildings

Psychiatry Clinic Ottakring

sustainable architecture with modern healthcare

Public Buildings

Aldi

A fantastic example of modern sustainable retail construction.

Office Buildings

Free City

An office building – efficient and innovative right from the start

Office Buildings

Facephi

from cinemas to state-of-the-art offices

Public Buildings

Tourist office Orelle

tourist office with holiday flat

We are there for you.

+44 (0) 20 3031 8070
General Business: office@klhuk.com
Project Enquiries: enquiry@klhuk.com

KLH UK Limited
23 Jacob Street
London SE1 2BG

We really wanted to say thank you to everyone who has been involved in getting us this far. We have been really excited to see the structure go up and the on-site team have done an amazing job. The CLT looks great.

Mary & Klaus Morris | Blackwood House

I would like to record that I have been very impressed with your work on site and the efficiency of your construction team. The finished product is exactly as expected and was completed ahead of programme. Thank you for the efforts of your team.

David Spooner | Construction Project Manager | Hastings Pier Charity

Mayfield School are delighted with the new buildings. Innovative use of space and light in the atrium areas and other specialist classrooms will enhance the possibilities available to our staff and students.
The Sixth Form is designed not only to give a real feature (Heller-Up staircase), but is also a practical and useable large space which can be used by the whole school for various activities. The new building and external areas have created a real ‘WOW’ factor for our community as a whole.

Allison Greenwood | Deputy Headteacher | Mayfield School

The Mayfield School Project was delivered on time and within budget. It is to an excellent quality of workmanship which surpassed the expectations of the client team and the end user. The building’s design is rational, durable and above all maintainable which will ensure that Mayfield School will continue to provide teaching excellence within the London Borough of Redbridge.

Steve McConaghy | Senior Construction Project Manager| London Borough of Redbridge

I am the HT of a school in the UK which has been constructed using CLT. I am tremendously impressed with the very calm and purposeful learning environment that has been created. The students are so proud of the building and the exposed CLT is a major factor in this as it gives a high-end quality finish not common in schools in the UK. The CLT construction method enabled the building process to be rapid which was a major factor in us moving in on time.

Keir Smith | Head Teacher | William Perkin C of E School

We are completely delighted with the CLT!!! It’s been very exciting seeing our project in the factory and then going-up on site so quickly.
We love the exposed CLT walls and the character it gives the interiors – we can’t wait to move in. I think that the KLH team has been excellent throughout, from first contact, through the quotation stage to shop-drawings and the on-site erection crew – everyone has been very professional and helpful at all times. It has been a pleasure working with you all – I would be very happy to use KLH again in the future.

Ruth Butler | Ruth Butler Architects | Convent Lane

There is a great ambience in occupying a CLT school and it generates interest and a positive atmosphere with students, staff and visitors. Would definitely recommend it to another school.

Head Teacher | City Academy, Norwich

We are there
for you.