Construction Time
Reduced
by a Third
With dimensionally accurate elements, already measured and approved by an external quality representative at the KLH Massivholz GmbH plant, it was possible to guarantee a high level of safety on the construction site. In contrast to the traditional solid construction, the construction time was reduced by more than 30%, the completion was 4 months earlier than planned.

Project Info
Design and Construction
Lend Lease
www.lendlease.com
Timber Engineering
KLH UK Ltd.
www.klhuk.com
Amount and Size of the Apartments
23 Apartments, Net living area 59 – 102 m²