harmonious architecture
The villas literally bring nature inside. Fully opening panoramic sliding glazing removes the boundaries between inside and outside. KLH® – CLT was used for the walls and roofs and glulam timber for columns. Rapid assembly due to a high degree of prefabrication and the resulting reduction in pollution of the environment is particularly emphasized.
Project Info
Architect
KHA
www.kha.studio
General Contractor
Sanken Overseas
www.sankenoverseas.com
project support
MACE International Limited
www.macegroup.com
Prefabrication
Venturer Timberwork
www.venturertimberwork.com
Location
Fari Islands, Maldives
Photography credits
The Ritz-Carlton Maldives | Fari Islands
Photo Gallery
More References