GWG Munich considered the new construction as part of the complete renovation process of the entire quarter. As well as the new courtyard development, this included the construction of a communal underground car park for all residents of the quarter, provision of bicycle and pushchair parking spaces, as well as creating green spaces and tenants’ gardens. The residential building planned for the inner courtyard was to be visually as light as possible, and built within a limited timeframe.

All this, because Gollierstrasse in the densely built-up Munich Westend does not allow for lengthy traffic obstructions and the neighbours surrounding the new building should be disturbed as little and for as short a time as possible. The ideal solution was therefore a timber construction, which could be constructed within three and a half weeks thanks to pre-fabrication. Transport of the materials had to be either through the very narrow courtyard entrance or by crane over the roof of the building in front.

One storey a week was the prescribed schedule for the carpenters to construct the three storeys, and it all went according to plan. From mid-November to mid-December 2016, they assembled the walls, ceilings and the roof. The wooden construction was already completed by Christmas. The windows had been installed and the roof was rain-proofed, so that at the beginning of 2017 work could be concentrated on the interior.

Because the building’s residential construction mix did not allow for a universal modular supporting structure in all places, the carpenters erected most of the interior walls as solid timber walls with a load bearing function. Gypsum boards were used as cladding.

Project Info

Our 
services.

Learn more

More References

References &
Inspirations

 

Refurbishment & Extensions

Timber Lofts

A new four-story building and the renovation and reuse of an existing five-story industrial building

Hotels

Hotel Green Solution House 2.0

A prototype for sustainable construction

Hotels

The Ritz-Carlton

Luxury in an exceptional resort

Single Family Houses

Haus S.

Hotels

Kulturhof Stanggass

Refurbishment & Extensions

The new house

Update for a 1980s house

Single Family Houses

Seehaus W.

   

Multi-storey Residential Buildings

Le Haut-Bois

The two structures, a 9- and a 6-storey building, are connected by the unique staircase that is both open on one side and glazed on the…

Single Family Houses

Haus HWG

Hotels

Milla Montis

Hotel with panoramic view of the Dolomite Mountains

KLH designer –
Without
registration,
anytime,
anywhere

KLH DESIGNER

ARCHITECTURAL | STRUCTURAL | ECO

Learn more

We are there for you.

+44 (0) 20 3031 8070
General Business: office@klhuk.com
Project Enquiries: enquiry@klhuk.com

KLH UK Limited
23 Jacob Street
London SE1 2BG

We are there
for you.