Great Eastern Buildings

Learn more

Lifetime
Homes
Standard

The site was formerly offices for the Great Eastern Railwayand is situated along the railway in Hackney/London. The building is designed to lifetime homes standard and part of the Borough-wide estate generation programme. It includes 18 new homes including 5 one-bedroom, 10 two-bedroom, and 3 three-bedroom homes. There are 6 shared ownership properties paid for through 12 homes for outright sale, as well as 114 m2 of commercial space.

Cross laminated timber (CLT) was the materials of choice for the superstructure of Great Eastern Buildings due to its inherent sustainability credentials, precision engineering and speed of installation.

The relative lightness of the CLT and its positive effect on the substructure costs helped to keep the project within the cost plan. Comparatively low numbers of vehicle movements helped greatly to maintain a good relationship with the neighbours in this residential neighbourhood.

 

 

Project Info

Total stored / sequestered carbon in the KLH panels for the Great Eastern Buildings project is 142 tonnes.

Download data sheet

Our 
services.

Learn more

More References

References &
Inspirations

 

Public Buildings

ST ALBANS

A building that defines the cultural centre of the community.

Refurbishment & Extensions

La Tour Watt

Public Buildings

Bronx Children´s Museum

A museum that brings children closer to nature and urban culture.

Modular construction

Montessori School

A modular timber school building for primary and secondary school children

Educational Buildings

Kinderhaus Kreuzfeld

An architectural masterpiece. Sustainably built with visible KLH® – CLT, it offers children an inspiring environment for education and community.

Educational BuildingsPassive Houses

GISS

s.ustainable e.nvironmental ed.ucation spaces   KLH® – CLT was integral in the build of these unique 82 square meter classrooms, built to the German Passivhaus Standard.…

HotelsModular construction

Twente – Family Homes

Sustainable and solid prefabricated houses

Educational BuildingsRefurbishment & Extensions

HLT Retz

The original building from the 1970s underwent an expansion with the addition of a courtyard building. This new structure seamlessly connects to the existing one, thanks…

Hotels

Houten Hotel Almere

Addition to an existing restaurant with over 172 hotel rooms on four floors.

Refurbishment & Extensions

Timber Lofts

A new four-story building and the renovation and reuse of an existing five-story industrial building

KLH designer –
Without
registration,
anytime,
anywhere

KLH DESIGNER

ARCHITECTURAL | STRUCTURAL | ECO

Learn more

We are there for you.

+44 (0) 20 3031 8070
General Business: office@klhuk.com
Project Enquiries: enquiry@klhuk.com

KLH UK Limited
23 Jacob Street
London SE1 2BG

We are there
for you.