Harris Academy Sutton

Learn more

First Passivhaus
Secondary School

The four-storey, six-for entry school accommodates 1,275 pupils and 95 staff within the impressive 10,625 m2 space. The superstructure consists predominantly of offsite manufactured glulam beam and columns and Cross laminated timber (CLT) wall and slab elements.

 

Classrooms are light and inspiring with optimised spatial orientation. The timber roof panels reflect the natural harmony of the building, with non-toxic materials providing exemplary air quality and environmental credentials.

The stunning 715 m2 sports hall is internally finished with exposed timber. The facility is used by students as well as local residents after hours, contributing to the healthy living values of the wider site.

Project Info

Total stored/sequestered carbon in the KLH panels for the Harris Academy project is 660 tonnes.

Download data sheet

Our 
services.

Learn more

More References

References &
Inspirations

 

Single Family Houses

Seehaus W.

   

Single Family Houses

Haus HWG

Hotels

Milla Montis

Hotel with panoramic view of the Dolomite Mountains

Multi-storey Residential Buildings

Apartments Molslaan

A housing complex for Young Professionals in the historic city center of Delft

Public Buildings

THE EAGLE

Mountain Top Resort

Refurbishment & Extensions

Hexenhaus – Gasthof zum Bräuhaus

Public Buildings

La Barroise

Office Buildings

Fantoftparken

A zero-emission office building classified as BREEAM Outstanding

Hotels

Suitentürme Hotel Moar Gut

The 5-storey suite towers and riding hall as part of the conversion and new construction of the Moar Gut family nature resort.

Public Buildings

Stapferhaus

KLH designer –
Without
registration,
anytime,
anywhere

KLH DESIGNER

ARCHITECTURAL | STRUCTURAL | ECO

Learn more

We are there for you.

+44 (0) 20 3031 8070
General Business: office@klhuk.com
Project Enquiries: enquiry@klhuk.com

KLH UK Limited
2 The Canvas House
25 Queen Elizabeth Street
London
SE1 2NL

We are there
for you.